1. This Invitation for Initial Selection for Works (Design and Build) follows the General Procurement Notice published on the World Bank Website and the UN Development Business (UNDB) on February 3, 2022.
2. The Government of the Republic of Liberia has applied for financing from the World Bank toward the cost of the Rural Economic Transformation project additional financing. and intends to apply part of the proceeds toward payments under the contract for the design and build of the Road Sections from Cote D’Ivoire Border to Toe Town to Zwedru 85km.
3. The Infrastructure Implementation Unit (IIU) of the Ministry of Public Works intends to initially select Applicants for Rehabilitation of the section of the Road from Cote D’Ivoire Border to Toe Town to Zwedru under Design Build and Transfer (DBT). The length of the corridor is 85 km and is contiguous to the stretch of 40 km from Tappita to Toe Town which is financed under the Rural Economic Transformation Project (RETRAP) The road has several cross-drainage structures (culverts, bridges over streams, and rivers). The works involve the development of a 2-lane highway with shoulders. The contract period is planned for three (3) years, plus 12 months Defect Lability Period. The section of road to be rehabilitated is in the southeastern part of Liberia. Applicants are expected to have the following minimum experience:
- A minimum number of two (2) similar contracts specified below that have been satisfactorily and substantially completed as a prime contractor, joint venture member management contractor, or subcontractor for at least the last 5 years starting from January 1, 2022, to January 1, 2018. Similarity includes:
- DBT/ DBMOT/ DBMT/ OPRC contracts, each of minimum value of US$70 million]
- A minimum design experience, using the above or other contracts, in at least two (2) contracts shall be demonstrated for the following key activities:
- Structural Concrete 35,700 m³
- Bituminous surfacing 98,175m³
- Base 178,500. m³
- Subbase 223,125 m³
- Subgrade 892,500m³
- Fill material 267,750 m³
- At least 2 Bridges over 30m long