Environmental and Social Impact Assessment (ESIA) for The Rehabilitation of The Ivory Coast Border – Toe Town – Zwedru Road (85 Km) Grand Gedeh County, Liberia | Final Report — Revised and Updated Edition
This report is the Government of Liberia’s Environmental and Social Impact Assessment (ESIA) for the rehabilitation of the Ivory Coast Border – Toe Town – Zwedru Road (85 km), Grand Gedeh County, Liberia (“the Project”), financed under the Liberia Rural Economic Transformation Project (RETRAP, P175263) Additional Financing (RETRAP-AF, P181083). The Ministry of Public Works (MPW), […]
Read MoreBiodiversity Field Survey ReportRetrap 85 Km Road CorridorB’hai Jorzon, Toe Town, Zwedru, Grand Gedeh County, LiberiaSurvey Phases: Phase 1 (Rainy Season, Oct–Nov 2025) & Phase 2 (Dry Season, Dec 2025–Feb 2026)
Project context. This Biodiversity Field Survey supports the rehabilitation and upgrading of an existing road corridor between B’hai Jorzon, Toe Town and Zwedru in Grand Gedeh County. The alignment is not a new road. It has been in use for many years. Conversion and fragmentation of habitat along the corridor occurred over previous decades and […]
Read MoreBiodiversity Management Plan (BMP); Rehabilitation of the Côte d’Ivoire Border – Toe Town – Zwedru Road (85 km)B’hai Jorzon (km 0) – Toe Town – Zwedru · Grand Gedeh County, Liberia
1.1 Purpose and Status This BMP is the Project instrument that translates the Biodiversity Field Survey (BFS) of the 85 km B’hai Jorzon–Toe Town–Zwedru corridor into measures that can be designed, contracted, supervised, and certified. The Project is the rehabilitation of an existing laterite road under the RETRAP-AF, P175263 / P181083. The BFS determined that […]
Read MoreENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP)
This document is the standalone Environmental and Social Management Plan (ESMP) for the Rehabilitation of the Ivory Coast Border – Toe Town – Zwedru Road (85 km), Grand Gedeh County, Liberia, financed under the Rural Economic Transformation Project (RETRAP) Additional Financing (P175263/P181083). It is the Employer’s governing management plan: it converts every mitigation, enhancement and […]
Read MoreLiberia Economic Corridors Project (LECO) | Environmental and Social Management Framework (ESMF) Final Report
The World Bank, through the International Development Association (IDA), will support the Government of Liberia in implementing the Liberia Economic Corridors Project (LECO, P513497). The Project Development Objective is to improve economic corridor connectivity and strengthen agricultural and mining value chains in Liberia. The lead implementing agency is the Ministry of Public Works (MPW) through […]
Read MoreBiodiversity Action Plan (BAP) – Buchanan–Cestos City Junction Road Corridor (60.9 km) Mano River Union Road Development and Transport Facilitation Programme (MRU/RDTFP)-Liberia
This Biodiversity Action Plan (BAP) has been prepared for the Buchanan–Cestos City Junction Road Project (60.9 km), including the 5.3 km Port of Buchanan link, under the Mano River Union (MRU) Transport and Trade Facilitation Programme. The project will upgrade the existing earth and gravel road to paved standard along the current alignment, with associated […]
Read MoreEnvironmental and Social Impact Assessment (ESIA) | Final Draft
The draft Environmental and Social Impact Assessment and Environmental and Social Management Plan (ESIA/ESMP) was prepared for the proposed Liberia Economic Corridor Project by the Ministry of Public Works (MPW), through its Infrastructure Implementation (IIU), with support from Royal Environmental Group-Liberia and independent consultants. It covers the proposed upgrading and paving of the 60.9 km […]
Read More