The Liberia Urban Resilience Project (LURP) is a World Bank funded project that aims to increase flood resilience and access to urban infrastructure in selected neighborhoods and to improve urban management in Liberia. The project became effective on 28 February 2023 and will be implemented over a period of 6 years, ending in June 2028.
The Project Development Objective (PDO) is to increase flood resilience and access to urban infrastructure in selected neighborhoods and to improve urban management in Liberia. Specific outcomes are:
- Outcome 1: Area protected from flooding
- Outcome 2: People benefitting from improved urban infrastructure (sex-disaggregated)
- Outcome 3: Urban management capacity enhanced
The four (4) main components of the Project are:
1) Climate Resilient Infrastructure and Urban Upgrading,
2) Strengthening Integrated Resilient Urban Development Capacity,
3) Project Management, and
4) Contingent Emergency Response Component.
Component One (1) will support flood risk management and community upgrading infrastructure in prioritized areas of Greater Monrovia. This will include investments in drainage infrastructure to improve connectivity of drainage networks to reduce climate and flood risk, neighborhood and market upgrading interventions to improve access to public services.
Subproject description
A subproject under component 1 has been identified and relates to drainage cleaning to mitigate an imminent flood risk in several parts of Greater Monrovia. This will benefit both subcomponents (subcomponent 1.1. Climate Risk Management Infrastructure and subcomponent 1.2. Climate Resilient Community and Market Upgrading).
The subproject under component 1 is referred to as “Drainage Cleaning Activity” (or “quick win activity” due to the time pressure caused by the rainy season). This encompasses the cleaning of drainage channels in the Central and Greater Monrovia areas. The cleaning of drainage channels is considered to be of an immediate and time-sensitive priority to avoid that clogged up drainage channels flood neighboring communities in the rainy season (between May and November). The subproject would result in immediate positive impacts as it will reduce flooding and protect people’s lives and assets in the communities adjacent to the targeted drainage channels. The proposed drainage cleaning is planned to be carried out through a labor-based approach, with an estimated number of 300 persons to be recruited and managed by a firm/company that the PMU will hire through competitive bidding. Using simple tools such as shovels, rakes, buckets, wheelbarrows, machetes/cutlasses and garbage bins, the 300 estimated workers to be recruited will be organized into small work teams and assigned to clean up defined lengths of the selected drainage channels. The cleaning will involve the manual removal of wastes from the drainage, desilting, shoulder cleaning, haulage and disposal of the collected wastes to the MCC operated landfill in Whein Town (northern Paynesville).